Enhanced Docking Clamps

Breakaways are inherently expensive, but what you'd be after is localizing the interface to the docking apparatus, giving the primary hull's bridge network and spacecraft's power grid a connection to the secondary hull's bridge network and power grid.
I hear you, but I think what I’ve put together makes more sense.
 
I would expect that they would be installed automatically during construction to power systems before the power plant and fuel tank were installed. Then of course they would be useful when overhauling the power plant as the shipyard would just hook to the power umbilical to keep life support, gravity etc working during the overhaul. Naturally search and rescue vessels would want to be able to connect to them as well to power systems if the power plant was down.

So I would assume standard power umbilicals are in fact present already.
No doubt that they are present, All I was saying is that the would be to be located at in the area that the clamp was connecting to.
 
16566-Cat-carrying-a-kitten-white-background.jpg


Wouldn't be there by default.

Designed for, tonnage, and cost.
 
Back
Top