Could someone familiar with the HG construction sequence check this for me and let me know if everything is OK?
Sorry about the formatting, how do you get a table into this?
Class: Fighter TL: 10 Max Displacement 20 tons
Item Description Ratings Displacement Tons Price (MCr)
Hull 20 tons (S2) Hull: 3 1.2000
Streamlined Structure: 1 0.1200
Reinforced Hull 10% 2.0000 2.0000
Heat Shielding 2.0000
Aerofins DM +2 1.0000 2.0000
Armour Crystaliron Points: 4 1.0000 0.6000
Maneuver Drive sF (Reaction) Thrust: 6 1.5000 3.0000
Power Plant sG (Fusion) Rating: 7 3.0000 6.0000
Bridge Cockpit for 2 3.0000 0.1000
Computer Model/2 Rating: 10 0.1600
Electronics Basic Military DM +0 2.0000 1.0000
Weapons Fixed MountingBeam Laser (1d6 long range)1.0000 1.1000
Anti-personnel Mount Adv Lt Autocannon (5000 rnds) 0.0010
Anti-personnel Mount Adv Lt Autocannon (5000 rnds) 0.0010
Fuel Reaction 10 GHrs (100 GTurns) 6.0000
Fuel Fusion Power Plant 2 days operation 0.3000
Cargo 0.2000
Software Maneuver/0
Library
Fire Control/2 Comp Rating: 10 4.0000
Evade/1 Comp Rating: 10 1.0000
Total Tonnage and Cost 20.0000 24.2820
Bulk Discount Cost 21.8538
Construction Time Initial: 24 weeks Subsequent: 15 weeks
Sorry about the formatting, how do you get a table into this?
Class: Fighter TL: 10 Max Displacement 20 tons
Item Description Ratings Displacement Tons Price (MCr)
Hull 20 tons (S2) Hull: 3 1.2000
Streamlined Structure: 1 0.1200
Reinforced Hull 10% 2.0000 2.0000
Heat Shielding 2.0000
Aerofins DM +2 1.0000 2.0000
Armour Crystaliron Points: 4 1.0000 0.6000
Maneuver Drive sF (Reaction) Thrust: 6 1.5000 3.0000
Power Plant sG (Fusion) Rating: 7 3.0000 6.0000
Bridge Cockpit for 2 3.0000 0.1000
Computer Model/2 Rating: 10 0.1600
Electronics Basic Military DM +0 2.0000 1.0000
Weapons Fixed MountingBeam Laser (1d6 long range)1.0000 1.1000
Anti-personnel Mount Adv Lt Autocannon (5000 rnds) 0.0010
Anti-personnel Mount Adv Lt Autocannon (5000 rnds) 0.0010
Fuel Reaction 10 GHrs (100 GTurns) 6.0000
Fuel Fusion Power Plant 2 days operation 0.3000
Cargo 0.2000
Software Maneuver/0
Library
Fire Control/2 Comp Rating: 10 4.0000
Evade/1 Comp Rating: 10 1.0000
Total Tonnage and Cost 20.0000 24.2820
Bulk Discount Cost 21.8538
Construction Time Initial: 24 weeks Subsequent: 15 weeks