AnotherDilbert
Emperor Mongoose
Backup J-drive:
Cost based on base size, not total size.
Advantage "Cost Reduction" removes the added cost for tech advantages, only the reduced cost remains. Presumably incorrect if several advantages are used, e.g. Decreased Fuel + Cost Reduction. Probably the same problem for all drives.
Backup jump drive uses everything from main jump drive, including size and TL validation:
Main:
Backup, note rating 1:
If you keep relative and absolute references appropriately, you can just copy paste the entire block and it will still be correct...
Cost based on base size, not total size.
Advantage "Cost Reduction" removes the added cost for tech advantages, only the reduced cost remains. Presumably incorrect if several advantages are used, e.g. Decreased Fuel + Cost Reduction. Probably the same problem for all drives.
Backup jump drive uses everything from main jump drive, including size and TL validation:
Main:

Backup, note rating 1:

If you keep relative and absolute references appropriately, you can just copy paste the entire block and it will still be correct...