Condottiere
Emperor Mongoose
Spaceships: Bridges, and Detachability
10. So we know are informed that a detached bridge has two weeks of life support, presumably thrust zero. and battery power (though one assumes without which you'd have have neither life support nor motivation).
11. Thrust zero would be easy, based on time and space, basically how long it lasts, and the volume of the now now breakaway hull.
12. Complicated by the fact that I've never seen an explanation of thrust zero in Traveller.
13. Great, two weeks life support.
14. But, for how many personnel?
15. Going by Core, does that include six months of powered non paid for life support?
16. Is battery power based on basic hull tonnage, plus manoeuvre drive thrust one, basically what solar panelling would supply?
17. In fact, I'd install solar panelling as the principal power unit.
18. And instead of thrust zero, add a highly technologized acceleration one manoeuvre drive.
19. Breakaway hull is two percent of total hull cost, and detached bridge is one hundred thirty percent of default bridge cost based on per hundred tonne blocks.
10. So we know are informed that a detached bridge has two weeks of life support, presumably thrust zero. and battery power (though one assumes without which you'd have have neither life support nor motivation).
11. Thrust zero would be easy, based on time and space, basically how long it lasts, and the volume of the now now breakaway hull.
12. Complicated by the fact that I've never seen an explanation of thrust zero in Traveller.
13. Great, two weeks life support.
14. But, for how many personnel?
15. Going by Core, does that include six months of powered non paid for life support?
16. Is battery power based on basic hull tonnage, plus manoeuvre drive thrust one, basically what solar panelling would supply?
17. In fact, I'd install solar panelling as the principal power unit.
18. And instead of thrust zero, add a highly technologized acceleration one manoeuvre drive.
19. Breakaway hull is two percent of total hull cost, and detached bridge is one hundred thirty percent of default bridge cost based on per hundred tonne blocks.