I am having trouble with calculating the Maintenance cost of the completed cruiser design and I will be using the numbers as shown on HG 1e p. 72 while trying to figure out where I'm going of track.
Total cost is MCr 55,535.7075. I believe that this is the cost of the first unit out of the shipyard.
Life support costs are (632 x 3,000) MCr1.896 per month. I can match the life support cost.
Maintenance costs are (55,508.7075/12 x 0.001) MCr4.6257 per month.
From CRB 1e p. 137: 1/12 of 0.1% of the ship's purchase price/month
From CRB 1e p. 105 Standard designs purchase cost is total hull cost reduced by 10%.
Just a quick look the MCr55,508.7075 is not 10% of the total cost of 55,535.7075.
The numbers have not been modified with any of the HG 1e Errata official corrections.
Where did the MCr55,508.7075 come from?
I am having trouble with calculating the Maintenance cost of the completed cruiser design and I will be using the numbers as shown on HG 1e p. 72 while trying to figure out where I'm going of track.
Total cost is MCr 55,535.7075. I believe that this is the cost of the first unit out of the shipyard.
Life support costs are (632 x 3,000) MCr1.896 per month. I can match the life support cost.
Maintenance costs are (55,508.7075/12 x 0.001) MCr4.6257 per month.
From CRB 1e p. 137: 1/12 of 0.1% of the ship's purchase price/month
From CRB 1e p. 105 Standard designs purchase cost is total hull cost reduced by 10%.
Just a quick look the MCr55,508.7075 is not 10% of the total cost of 55,535.7075.
The numbers have not been modified with any of the HG 1e Errata official corrections.
Where did the MCr55,508.7075 come from?