Tom Kalbfus
Mongoose
These drives are a precursor to the maneuver drive, they require reaction mass as well as energy provided by the power plant. The power plant is a fusion reactor that runs on a combination of tritium and deuterium, the reaction mass of both drives is simply hydrogen, all three are stored in liquid form and may be obtained from a gas giant, or from water using a fuel processor, or may be bought at a spaceport.
There are two types or reaction drives, both are powered by a fusion reactor of the same drive code or better. The Fast Drive is used for getting into orbit from a planet's surface. It takes a 6 g Fast Drive 20.5 minutes to get into a low orbit around Jupiter (300 km altitude) from deep inside Jupiter's atmosphere (the 1 bar level) So I'll use 20.5 minutes as the standard duration for determining reaction mass requirements. The Slow Drive is used for getting around the Solar System, unlike the fast drive, acceleration is rated from 1 to 6 hundredths of an Earth gravity. I've determined that you need 43 days to go from Earth to Saturn when the two planets are in opposition, so 43 days is my standard duration for the Slow Drive. Drive Costs are in US dollars, if you wish to use British Pounds halve the costs in that column.
Drive Costs
------ Fast Drive ------ 20.5 min-- Slow Drive ------ 43 days of Power Plant----- ------ 43 days of
Drive ------ ------------------ Reaction--------------------- Reaction---------------------------- Fuel
Code Tons Cost $----------- Mass Tons Cost $----------- Mass Tons Cost $------------------ Tons
A---- 10--- $20,000,000---- 10--- 2---- $8,000,000------ 10--- 4---- $16,000,000---- 6.2
B---- 15--- $40,000,000---- 20--- 3---- $16,000,000---- 20--- 7---- $32,000,000---- 9.3
C---- 20--- $60,000,000---- 30--- 5---- $24,000,000---- 30--- 10--- $48,000,000---- 12.3
D---- 25--- $80,000,000---- 40--- 7---- $32,000,000---- 40--- 13--- $64,000,000---- 15.4
E---- 30--- $100,000,000--- 50--- 9---- $40,000,000---- 50--- 16--- $80,000,000---- 18.5
F---- 35--- $120,000,000--- 60--- 11--- $48,000,000---- 60--- 19--- $96,000,000---- 21.5
G---- 40--- $140,000,000--- 70--- 13--- $56,000,000---- 70--- 22--- $112,000,000--- 24.6
H---- 45--- $160,000,000--- 80--- 15--- $64,000,000---- 80--- 25--- $128,000,000--- 27.7
J---- 50--- $180,000,000--- 90--- 17--- $72,000,000---- 90--- 28--- $144,000,000--- 30.8
K---- 55--- $200,000,000--- 100-- 19--- $80,000,000---- 100-- 31--- $160,000,000--- 33.8
L---- 60--- $220,000,000--- 110-- 21--- $88,000,000---- 110-- 34--- $176,000,000--- 36.9
M---- 65--- $240,000,000--- 120-- 23--- $96,000,000---- 120-- 37--- $192,000,000--- 40
N---- 70--- $260,000,000--- 130-- 25--- $104,000,000--- 130-- 40--- $208,000,000--- 43
P---- 75--- $280,000,000--- 140-- 27--- $112,000,000--- 140-- 43--- $224,000,000--- 46.1
Q---- 80--- $300,000,000--- 150-- 29--- $120,000,000--- 150-- 46--- $240,000,000--- 49.2
R---- 85--- $320,000,000--- 160-- 31--- $128,000,000--- 160-- 49--- $256,000,000--- 52.3
S---- 90--- $340,000,000--- 170-- 33--- $136,000,000--- 170-- 52--- $272,000,000--- 55.3
T---- 95--- $360,000,000--- 180-- 35--- $144,000,000--- 180-- 55--- $288,000,000--- 58.4
U---- 100-- $380,000,000--- 190-- 37--- $152,000,000--- 190-- 58--- $304,000,000--- 61.5
V---- 105-- $400,000,000--- 200-- 39--- $160,000,000--- 200-- 61--- $320,000,000--- 64.5
W--- 110-- $420,000,000--- 210- 41--- $168,000,000--- 210-- 64--- $336,000,000--- 67.6
X---- 115-- $440,000,000--- 220-- 43--- $176,000,000--- 220-- 67--- $352,000,000--- 70.7
Y---- 120-- $460,000,000--- 230-- 45--- $184,000,000--- 230-- 70--- $368,000,000--- 73.8
Z---- 125-- $480,000,000--- 240-- 47--- $192,000,000--- 240-- 73--- $384,000,000--- 76.8
There are two types or reaction drives, both are powered by a fusion reactor of the same drive code or better. The Fast Drive is used for getting into orbit from a planet's surface. It takes a 6 g Fast Drive 20.5 minutes to get into a low orbit around Jupiter (300 km altitude) from deep inside Jupiter's atmosphere (the 1 bar level) So I'll use 20.5 minutes as the standard duration for determining reaction mass requirements. The Slow Drive is used for getting around the Solar System, unlike the fast drive, acceleration is rated from 1 to 6 hundredths of an Earth gravity. I've determined that you need 43 days to go from Earth to Saturn when the two planets are in opposition, so 43 days is my standard duration for the Slow Drive. Drive Costs are in US dollars, if you wish to use British Pounds halve the costs in that column.
Drive Costs
------ Fast Drive ------ 20.5 min-- Slow Drive ------ 43 days of Power Plant----- ------ 43 days of
Drive ------ ------------------ Reaction--------------------- Reaction---------------------------- Fuel
Code Tons Cost $----------- Mass Tons Cost $----------- Mass Tons Cost $------------------ Tons
A---- 10--- $20,000,000---- 10--- 2---- $8,000,000------ 10--- 4---- $16,000,000---- 6.2
B---- 15--- $40,000,000---- 20--- 3---- $16,000,000---- 20--- 7---- $32,000,000---- 9.3
C---- 20--- $60,000,000---- 30--- 5---- $24,000,000---- 30--- 10--- $48,000,000---- 12.3
D---- 25--- $80,000,000---- 40--- 7---- $32,000,000---- 40--- 13--- $64,000,000---- 15.4
E---- 30--- $100,000,000--- 50--- 9---- $40,000,000---- 50--- 16--- $80,000,000---- 18.5
F---- 35--- $120,000,000--- 60--- 11--- $48,000,000---- 60--- 19--- $96,000,000---- 21.5
G---- 40--- $140,000,000--- 70--- 13--- $56,000,000---- 70--- 22--- $112,000,000--- 24.6
H---- 45--- $160,000,000--- 80--- 15--- $64,000,000---- 80--- 25--- $128,000,000--- 27.7
J---- 50--- $180,000,000--- 90--- 17--- $72,000,000---- 90--- 28--- $144,000,000--- 30.8
K---- 55--- $200,000,000--- 100-- 19--- $80,000,000---- 100-- 31--- $160,000,000--- 33.8
L---- 60--- $220,000,000--- 110-- 21--- $88,000,000---- 110-- 34--- $176,000,000--- 36.9
M---- 65--- $240,000,000--- 120-- 23--- $96,000,000---- 120-- 37--- $192,000,000--- 40
N---- 70--- $260,000,000--- 130-- 25--- $104,000,000--- 130-- 40--- $208,000,000--- 43
P---- 75--- $280,000,000--- 140-- 27--- $112,000,000--- 140-- 43--- $224,000,000--- 46.1
Q---- 80--- $300,000,000--- 150-- 29--- $120,000,000--- 150-- 46--- $240,000,000--- 49.2
R---- 85--- $320,000,000--- 160-- 31--- $128,000,000--- 160-- 49--- $256,000,000--- 52.3
S---- 90--- $340,000,000--- 170-- 33--- $136,000,000--- 170-- 52--- $272,000,000--- 55.3
T---- 95--- $360,000,000--- 180-- 35--- $144,000,000--- 180-- 55--- $288,000,000--- 58.4
U---- 100-- $380,000,000--- 190-- 37--- $152,000,000--- 190-- 58--- $304,000,000--- 61.5
V---- 105-- $400,000,000--- 200-- 39--- $160,000,000--- 200-- 61--- $320,000,000--- 64.5
W--- 110-- $420,000,000--- 210- 41--- $168,000,000--- 210-- 64--- $336,000,000--- 67.6
X---- 115-- $440,000,000--- 220-- 43--- $176,000,000--- 220-- 67--- $352,000,000--- 70.7
Y---- 120-- $460,000,000--- 230-- 45--- $184,000,000--- 230-- 70--- $368,000,000--- 73.8
Z---- 125-- $480,000,000--- 240-- 47--- $192,000,000--- 240-- 73--- $384,000,000--- 76.8