I need to come up with some house rules for modifications to ships.
I have a group that's been playing for awhile now, every time they get a ship they have to mod it heavily. Swapping out guns on the turrets is no big deal but they usually drop other items as well. Sometimes they get rid of a couple staterooms, they always seem to get rid of the low berths, then they start adding armor and cargo space.
Now I don't want to veto doing any changes to a ship, however they have started to make drastic changes just because they fit mathematically within the hull space. I have been trying to convince them that subtracting x number of tons of equipment on Deck A doesn't mean you can add x number of tons of space on Deck B. That is finally starting to sink in at least. Their current plans are to nearly double the cargo space on a ship they are buying by reducing the fuel storage in that same deck.
I need a rule to figure out how long these changes will take. In essence they are taking out the bulkheads that are in place and extending the decking then adding new bulkheads. Something along the lines of for every ton of changed deckplans it will take x amount of days (weeks, hours) to retrofit the ship.
I have a group that's been playing for awhile now, every time they get a ship they have to mod it heavily. Swapping out guns on the turrets is no big deal but they usually drop other items as well. Sometimes they get rid of a couple staterooms, they always seem to get rid of the low berths, then they start adding armor and cargo space.
Now I don't want to veto doing any changes to a ship, however they have started to make drastic changes just because they fit mathematically within the hull space. I have been trying to convince them that subtracting x number of tons of equipment on Deck A doesn't mean you can add x number of tons of space on Deck B. That is finally starting to sink in at least. Their current plans are to nearly double the cargo space on a ship they are buying by reducing the fuel storage in that same deck.
I need a rule to figure out how long these changes will take. In essence they are taking out the bulkheads that are in place and extending the decking then adding new bulkheads. Something along the lines of for every ton of changed deckplans it will take x amount of days (weeks, hours) to retrofit the ship.