A did a question a long time ago about the construction table in Arms & Equipment. It was not clear enough, and I think we should have an official answer, so I repeat it:
Construction:
Let's take House, Simple
Man Hours = 1d6 x2 per square meter; Cost per Man Hour = 5 CP per 8 man hours
House:
Let's build a 9m x 9m house. This is 81 square meters
Roll 1d6 x 2: Result (3) x 2 = 6
Total Man Hours = 6 (the roll) * 81 (square meters) = 486 Man Hours
Cost Per Man Hour for Simple House:
5 CP per 8 Man Hours
Total Cost
486 man hours/8 = 60.75 * 5 CP = 303.75 CP = 30 SP
So you can build a 9x9 simple house in under a day for about the price of a dagger, or almost the price of a spade! (25 SP). Everything seems a bit low in all the calculations, but that seems to be the way it is supposed to be.
Loz, Pete, could you tell me if I am doing anything wrong, please?
Construction:
Let's take House, Simple
Man Hours = 1d6 x2 per square meter; Cost per Man Hour = 5 CP per 8 man hours
House:
Let's build a 9m x 9m house. This is 81 square meters
Roll 1d6 x 2: Result (3) x 2 = 6
Total Man Hours = 6 (the roll) * 81 (square meters) = 486 Man Hours
Cost Per Man Hour for Simple House:
5 CP per 8 Man Hours
Total Cost
486 man hours/8 = 60.75 * 5 CP = 303.75 CP = 30 SP
So you can build a 9x9 simple house in under a day for about the price of a dagger, or almost the price of a spade! (25 SP). Everything seems a bit low in all the calculations, but that seems to be the way it is supposed to be.
Loz, Pete, could you tell me if I am doing anything wrong, please?